We don't bill hours. One fixed price on a defined outcome, agreed before anything starts — and if the work runs long, that comes out of our margin, not your invoice.
The bar has no right-hand edge. You find out what the project cost when the last invoice lands.
One number, agreed up front. If the work runs long, it comes out of our margin, not your invoice.
Four things an hourly rate does to a project — and what one agreed number does instead.
An hourly rate rewards slowness. The longer a task takes, the more the vendor bills — whether or not you got more value out of it.
On hourly, speed costs the vendor money. On a fixed price, speed is our margin — never your bill.
A "20–40 hours" estimate isn't a price. It's a guess you pay to have refined while the work is running.
Every hour past the estimate lands on your invoice. On a fixed price it lands on ours.
The multiple below is a cost measurement from our own usage data. It is not a discount, and it is not the review bar moving.
cheaper than metered AI pricing for the same real usage
We run Claude Code and Cursor — the same tools most consultancies and in-house teams already pay for. The difference is the setup: one senior engineer directing specialized agents across cost-tiered models, with five blocking gates before anything reaches a protected branch. That's why a six-week timeline is real, and why a fixed number can be what it is.
Typecheck, secret scan, an independent model review, and a senior sign-off — every diff, every time.
Weeks instead of quarters, and a price set on the outcome — not a discount line on an invoice.
If delivery runs slower than we planned inside the agreed scope, that comes out of our margin.
When the number is fixed, you're paying for what actually decides whether the project lands.
If the work runs past what we estimated, inside the agreed scope, that's our problem. The risk is priced in before we start.
No hand-off to juniors after the sales call. The engineer you talk to is the one accountable for every line that ships.
Every release is tested on staging and approved by you before it goes out — not a timesheet you have to take on faith.
Bugs, misreads, and the second attempt at something we got wrong the first time sit inside the price. Only genuinely new scope produces a new number.
The audit is the real product here — most of the risk in a fixed price gets priced out before a line of code exists.
We read the spec, talk to your stakeholders, and write down what the work actually requires — not what it looks like on paper.
Each part is split into mechanical work, which compresses hard, and judgement work, which needs senior calls. The two cost very different amounts to deliver.
The number comes from what the outcome is worth to you and how much risk we absorb — not from a guess at an hour count.
Work ships in stages. You approve each one on staging before the next starts. No mid-project surprises.
The scoping conversation is free. If the work can't be priced flat, we say so on the call instead of billing you to find out.
Audits, proposal reviews, and fractional CTO. Written deliverables, fixed price.
Fixed-scope sprints and foundation installs. One estimate, one price.
Production-ready Next.js + Contentful starter, delivered to your repo.
No. Everything is fixed price, agreed before work starts. If something falls outside the agreed scope, we stop and price the addition before continuing — never a surprise hourly invoice.
We stop, write down the new scope, and you get a price on the change before we continue. No "we'll sort it out later" invoices.
The price reflects what the outcome is worth, the risk we absorb, and that a senior engineer is accountable end to end — not a timesheet from a team you've never met.
That's our problem. If we run past our own estimate inside the agreed scope, you don't pay more.
Yes, on most packages — and always on the Enterprise Starter, which can be spread over 12 months. Ask at kickoff.
Probably. Most work can be priced flat after a short audit conversation — that's the point of the audit step.
Bring the scope you have — a spec, a quote you don't trust, or a rough idea. You'll leave the call with a fixed number, not a guess.